JOB REFERENCE Fabrication & Installation Tubes under ASME Code Inspection Bending Tubes Inspection Weld Joint Inspector Level II for NDT Hydrostatic Test Kamphaeng Phet Area in 2019 Fabrication & Installation Bank Tubes under ASME Code Inspection Bending Tubes Inspection Weld Joint Inspector Level II for NDT Hydrostatic Test Suphanburi Area in 2018 Fabrication & Installation Air Pre Heater Tubes under ASME Code Nakornpathom Area in 2018 Lamphun Area in 2018 Biomass Power Plant 9.9 Mw. Commissioning : 12/5/2017 Inspection Bending TubesProject Schedule : 4 Months Manpower : 40 Peoples Kanchanaburi Area Scope of Work Fabrication & Installation Total Weight 423.5 Tons Fabrication & Installation Tank under ASME Code Inspector Level II for NDT Leak Test Ratchaburi Area in Year 2017 Khonkaen Area in 2018 Nakhon Si Thammarat Area in 2018 Inspection All of Travelling Grate Stoker Replace Spare Parts Alignment Travelling Grate Stoker Check Gap & Level Replace Shaft Lamphun Area in 2018 Annual Shutdown Bio-Mass Power Plant Replace Air Pre-Heater Tubes Replace Step Grate Sandblast Tanks Pichit Area in 2019